This lagoon system was designed to handle waste water flow for 1,100 persons with considering the 256 m3/average daily flow. The effluent quality should achieve 30 mg/L BOD and TSS. This treatment plant consist: lift station, headwork, aeration lagoon, settling lagoon, sludge pump, chlorination tank and sludge drying bed.
[table id=22 /] The RPTC is an ANP Police Training Establishment which will house approximately 3,000 personnel consisting of trainees and staff. Site is located approximately 100 km South of Herat City, the Provincial Capital of Herat Province and 24 km Northeast of Shindad Bazaar in Shindad, Herat, Afghanistan. This Project is defined […]
Considering the 2056 m3/average daily flow, this project includes lift station, flow meter, headwork (bar screen and grit chamber), aeration lagoons, settling ponds, sludge pump station, chlorination system, sludge drying bed, gray water pump station and reuse system. Green Tech shall also furnish, install, and test flexible membrane lining for above cited project with below […]
Green Tech shall furnish, install, and test flexible membrane lining for above cited project with below specifications. Type: Geomembrane Material: HDPE Color: Black – Double sided (Smooth) Thickness: 1.5 mm Width: 1m to 7m Site Area: 12000 Square meter Testing: Destructive Seam Test + Air Channel Test Reports: Work Plan + QC Plan
[table id=21 /] Green Tech Construction & Engineering Company has been awarded by US Army Corps of Engineers (USACE) to implement below services: Water quality testing Downhole dual camera imaging And pump removal This is a two year contract in which Green Tech Co. Green Tech Co. will provide above mentioned tasks for […]
This wastewater Treatment Plant (WWTP) is a lagoon system and designed to provide the effluent quality of 30 mg/l BOD and TSS. Green Tech shall provide the Geomembrane of below specification: Type: Geomembrane Material: HDPE Color: Black Double sided (Smooth) Thickness: 1.5 mm Width: 1m to 7m Area: 14000 Square meter Testing: Destructive Seam […]
This lagoon system was designed to handle waste water flow for 5600 persons considering the 851.2 m3/average daily flow. The effluent quality should achieve 30 mg/L BOD and TSS. This treatment plant consist: lift station, headwork, aeration lagoon settling lagoon, sludge pump, chlorination tank and sludge drying bed.
[table id=17 /] Green Tech Construction & Engineering Company has been selected by ECCI, International, LLC to handle WWTP utilization of services for UP Provincial HQ in Kunduz, Afghanistan. This package shall have the capacity of 80 m3/day and covers 700 beneficiaries on the site. This project is categorized as Design/Build and Green Tech Company […]
[table id=6 /] Under this contract, Green Tech will be obligated to perform below services: Site Survey Geotechnical Investigation Water Assessment Completer Adapt Design for Uniform Police Headquarter (Civil, Architecture, Electrical and Mechanical Design)
We provided two (2) AEROMIX model A-35M24-SUSHC prefabricated steel extended aeration/complete mix active sludge wastewater treatment systems manufactured by AEROMIX Systems, Inc., Golden Valley, Minnesota. We also provide below services: Installation of fiber glass lift station and submersible pump Installation and commissioning of two WWTP packages, and Consultancy of drying bed construction