class="post-template-default single single-post postid-152 single-format-standard">
  • Client: USACE
  • Completion: Ongoing
  • Location: Herat
  • Prime Contractor: Yuksel Construction Company

Services Provided

  • Design
  • Supply & Installation
  • Start-up & Commissioning

This lagoon system was designed to handle waste water flow for 1,100 persons with considering the 256 m3/average daily flow. The effluent quality should achieve 30 mg/L BOD and TSS.

This treatment plant consist: lift station, headwork, aeration lagoon, settling lagoon, sludge pump, chlorination tank and sludge drying bed.