class="archive author author-mjyaqubi author-1">

Blog Archives

Lagoon System for ANA Gamberi Garrison, Jalalabad

This WWTP was to handle waste water flow for 9,000 persons, with considering the 1,116 m3/average daily flow. the effluent quality should achieve 30 mg/L BOD and TSS.

Geomembrane Services in Camp Hero, Kandahar

Green Tech Company shall provide all necessary  installation of Geomembrane liner materials required to complete six (6) lagoon and two (2) settling ponds within the Camp Hero East project Wastewater Treatment Plant.

Lagoon System for ANCOP 5th Patrol Battalion, Nahr-e-Saraj, Helmand

This lagoon system was designed to handle waste water flow for 473 persons, with considering the 33 m3/average daily flow. The effluent quality should achieve to 30 mg/L BOD and TSS. This treatment plant consist: lift station, headwork, aeration lagoon, … Continue Reading

Packaged WWTP for Afghan National Army: Camp Scorpion, Kabul

we shall provide one (1) AEROMIX model TE11-1040-DFESHHC prefabricated steel extended aeration wastewater treatment systems manufactured by AEROMIX Systems, Inc,. Golden Valley, Minnesota. This system is designed for treating a total of 104,000 gallons per day of 400 mg/L BOD … Continue Reading

Water Testing Services for European Union Police Mission in Afghanistan

Green Tech has been awarded a new contract to conduct water testing monthly (once a month) in EUPOL HQ. We shall collect water samples from 4-5 different locations of the EUPOL compound for testing of microbiological and chemical contamination of … Continue Reading

Packaged WWTP: Afghan National Army, Brigade Garrison, Ghazni

We shall provide one AEROMIX model A-100M40-SUSHC prefabricated steel extended aeration/complete mix activated sludge wastewater treatment package manufactured by AEROMIX Systems, Inc., Golden Valley, Minnesota, U.S.A. The wastewater treatment system will have a design flow of 100,000 GDP (375,000 LPD) … Continue Reading

Packaged WWTP for New Kabul Compound, Kabul

Green Tech Company has been awarded the fabrication of a steel secondary treatment system for New Kabul Compound.  The wastewater treatment plant has been designed for average daily flow of 188,000 gallons per day.  

Lagoon System for ANA South Rushmore Infantry Kandak Sharana, Paktika

This project consists of design, supply and installation of a new wastewater treatment plant (partial min aerated lagoon). This WWTP was designed to handle waste water flow of 896 persons, with considering the 167 m3/average daily flow. The effluent quality … Continue Reading

SOF Mobile Strike Fore, Camp Darulaman, Kabul

   

Lagoon System for Regional Police Training Center in Shindand, Herat

This lagoon system was designed to handle waste water flow for 1,100 persons with considering the 256 m3/average daily flow. The effluent quality should achieve 30 mg/L BOD and TSS. This treatment plant consist: lift station, headwork, aeration lagoon, settling … Continue Reading