class="post-template-default single single-post postid-150 single-format-standard">
  • Client: USACE
  • Completion: Ongoing
  • Location: Helmand
  • Prime Contractor: Venco-Imtiaz Construction Company (VICC)

Services Provided

  • Design
  • Supply & Installation
  • Start-up & Commissioning

This lagoon system was designed to handle waste water flow for 473 persons, with considering the 33 m3/average daily flow. The effluent quality should achieve to 30 mg/L BOD and TSS.

This treatment plant consist: lift station, headwork, aeration lagoon, settling lagoon, sludge pump, chlorination tank and sludge drying bed.