Balkh University Infrastructure Project, Balkh, Afghanistan

balkh uni - Copy

This project is about to conducting and provide site topographic survey, current and accurate survey of the impacted areas of the purposed electric Substation for dorm building, the site survey includes existing ground elevations, relative obstacle heights, drainage patterns, buildings, … Continue Reading

ANP Bagram Ground Defense Area Checkpoints, Bagram, Afghanistan

Untitled-1

This project consists of the Site Adapt construction of ANP Bagram Ground Defense Area Checkpoints at various locations around Bagram Province. ANP Bagram Ground Defense Area Checkpoints consist of perimeter wall, vehicle gate, personnel gate, reinforced concrete entrance pad, guard … Continue Reading

Survey and Design of Refurbishment of WWTP at NATO HQ RS, Kabul, Afghanistan

HQ RS

The purpose of the project is to incorporate the new equipment in to the existing facility, to refurbish the technical solution and bring the whole system up to the requested standards. Green Tech is responsible for design supervision and installation … Continue Reading

Survey and Design of Day Care (children), Kabul, Afghanistan _MOD

mod

The purpose of the project is to enlarge and existing building placed in the Ministry of Defense (MOD) in Kabul, Afghanistan. The new building will be used for Day Care Facility of women and children and it is not only … Continue Reading

Maihan Industrial Park ESIA, Herat, Afghanistan

herat eiii

The objective of this project is Environmental Studies including development of ESIA report for Maihand Industrial Park, which located in Guzara District of Herat Province. This environmental assessment study includes study the existing environmental and social conditions, potential impacts and … Continue Reading

Kajaki Dam Phase II ESIA, Helmand, Afghanistan

kajaki

The objective of this project is Environmental Studies including development of ESIA report for the Kajaki Dam Phase II project. This environmental assessment study includes study the existing environmental conditions in order to establish the present physical, biological and socio-economic … Continue Reading

ESMP of Jaghato-Nawor Road (88 km) , Ghazni Province, Afghanistan

Jaghato To Nawor Road

The objective of this project was Environmental and Social Studies including Environmental and Social Management Plan, Monitoring Plan and Health and Safety Plan. This environmental assessment study includes study the existing environmental conditions in order to establish the present physical, … Continue Reading

PD-9 WWTP, Kabul, Afghanistan

nnnn

The PD-9 wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. This project consists of design and construction of a wastewater treatment plant (WWTP) that includes WWTP package, lift station and drying bed. … Continue Reading

Water Audit Consultancy UNICEF Office, Kabul, Afghanistan

Water Assessment/Audit report is including of three phases, first phase is existing documents and data review and evaluation and next phase was site work activities and reporting is final stage. The duration of this project is 22 days and the … Continue Reading

RTC Wastewater Treatment System, Herat, Afghanistan

herat

The RTC wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. Green Tech was responsible for all design and installation, Start-up and commissioning of both systems. It had started on March 25, 2017.