  • Client: Biltek
  • Completion Date: Sep 2018
  • Location: Kabul, Afghanistan
  • Refrences: Available on Request
  • Service Provided: Design WASTE WATER TREATMENT PLANT (WWTP)
  • Start Date: May 2018

Services Provided

The work consists of the design of a new Wastewater Treatment Plant (WWTP) Aeriated Mixed Lagoon System at the Pol-i-Charkhi prison.
This project is defined as the provision of material, labor, and equipment to construct WWTP lagoon system to accommodate 13,800 people.
The design consists several stages as 35%, 65%, 95% and 100% and it includes process narrative report / analysis, plan and detail drawings, and specification for the material used within the project.