class="post-template-default single single-post postid-154 single-format-standard">
  • Client: USACE
  • Completion: February 2013
  • Location: Mazar-e-Sharif
  • Prime Contractor: Omran Holding Group

Services Provided

  • Design
  • Supply & Installation
  • Start-up & Commissioning

This wastewater treatment plant (WWTP) is a lagoon system and designed to handle 12,000 people with wastewater generation of 125 liters per person for each day. The effluent quality should achieve to 30 mg/L BOD and TSS. This treatment system consist of headworks, Pump stations, lagoons, chlorination tank, sludge drying bed and laboratory/control building.