The work consists of the design, equipment procurement and installation for the Asia Consulting Group Wastewater Treatment Plant (WWTP). The plant is a small scale concrete package appropriate for residential buildings. Design part consists of design stages as 35%, 65%, 95% and 100% which includes process design report, detailed drawings and specification.