class="single single-post postid-598 single-format-standard">
  • Client: Asia Consultancy Group (ACG).
  • Start Date: 19 July 2018.
  • Completion Date: 1 Jan 2019.
  • Location: Kabul, Afghanistan.
  • Service Provided: WASTE WATER TREATMENT PLANT (WWTP).
  • Refrences: Available on request.

Services Provided

The work consists of the design, equipment procurement and installation for the Asia Consulting Group Wastewater Treatment Plant (WWTP). The plant is a small scale concrete package appropriate for residential buildings. Design part consists of design stages as 35%, 65%, 95% and 100% which includes process design report, detailed drawings and specification.