class="post-template-default single single-post postid-128 single-format-standard">
  • Client: USACE
  • Completion: On-going
  • Location: Helmand
  • Prime Contractor: Stoneroof Construction Company

Services Provided

  • Supply & Installation
  • Start-up & Commissioning

This wastewater Treatment Plant (WWTP) is a lagoon system and designed to provide the effluent quality of 30 mg/l BOD and TSS.  Green Tech shall provide the Geomembrane of below specification:

 

Type: Geomembrane
Material: HDPE
Color: Black Double sided (Smooth)
Thickness: 1.5 mm
Width: 1m to 7m
Area: 14000 Square meter
Testing: Destructive Seam Test + Air Channel Test
Reports: Work Plan + QC Plan