class="post-template-default single single-post postid-103 single-format-standard">
  • Client: USACE
  • Completion: Ongoing
  • Location: Farah
  • Prime Contractor: ECCI

Services Provided

  • Supply & Installation -Geomembrane & Geotextile -Aerators
  • Start-up & Commissioning

This lagoon system was designed to handle waste water flow for 5600 persons considering the 851.2 m3/average daily flow. The effluent quality should achieve 30 mg/L BOD and TSS.

This treatment plant consist: lift station, headwork, aeration lagoon settling lagoon, sludge pump, chlorination tank and sludge drying bed.