This project consists of design, supply and installation of a new wastewater treatment plant (partial min aerated lagoon).
This WWTP was designed to handle waste water flow of 896 persons, with considering the 167 m3/average daily flow. The effluent quality should achieve to 30 mg/l BOD and TSS.
This treatment plant consist of lift station, headwork, aeration lagoon, settling lagoon, sludge pump, chlorination tank and sludge drying bed.