This wastewater treatment plant (WWTP) is a lagoon system and designed to handle 12,000 people with wastewater generation of 125 liters per person for each day. The effluent quality should achieve to 30 mg/L BOD and TSS. This treatment system consist of headworks, Pump stations, lagoons, chlorination tank, sludge drying bed and laboratory/control building.