• Project name: Survey and Design of Refurbishment of Waste Water Treatment plant at NATO HQ RS, Kabul, Afghanistan
  • Client: Biltek
  • Service Provided: Survey and Design
  • Completion Status: On-Going
  • Reference: Available based on requirement

Services Provided

The purpose of the project is to incorporate the new equipment in to the existing facility, to refurbish the technical solution and bring the whole system up to the requested standards. Green Tech is responsible for design supervision and installation services for waste water treatment plant.