This project is about to conducting and provide site topographic survey, current and accurate survey of the impacted areas of the purposed electric Substation for dorm building, the site survey includes existing ground elevations, relative obstacle heights, drainage patterns, buildings, drives, sidewalks, fences, generator stations, above and below ground utilities and any other significant is features pertinent to the construction of this new electrical connection part of the project. Green Tech is responsible for survey and design of this project, the start date is October 9, 2017.