The objective is for the design and construction services for the Afghan National Army (ANA) Kandahar Air Wing (KAW) Water Well System and Waste Water System Upgrade, Kandahar, Afghanistan. The project consists of a water system upgrade to accommodate 3,500 personnel. These upgrades include drilling of a new well(s) into the uncontaminated aquifer; piping the new well’s water into the current/existing distribution systems and treating the pipes to remove the contaminants currently in the system; establish storage tanks that hold 3 days of storage; construction of the new well house and booster pump house with booster pump system; establish fencing around pump house; and demolition of old wells.