PD-9 WWTP, Kabul, Afghanistan

PD-9 WWTP, Kabul, Afghanistan

The PD-9 wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. This project consists of design and construction of a wastewater treatment plant (WWTP) that includes WWTP package, lift station and drying bed. Green Tech is responsible for all design and installation, Start-up and commissioning of both systems. This project has started on March 27, 2017.

Leave a Reply

Your email address will not be published.