The objective of this project is Environmental Studies including development of ESIA report for the Kajaki Dam Phase II project. This environmental assessment study includes study the existing environmental conditions in order to establish the present physical, biological and socio-economic scenario and also to predict future impacts owing to construction, operation and maintenance of the […]
The objective of this project was Environmental and Social Studies including Environmental and Social Management Plan, Monitoring Plan and Health and Safety Plan. This environmental assessment study includes study the existing environmental conditions in order to establish the present physical, biological and socio-economic scenario and also to predict future impacts owing to construction, operation and […]
The PD-9 wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. This project consists of design and construction of a wastewater treatment plant (WWTP) that includes WWTP package, lift station and drying bed. Green Tech is responsible for all design and installation, Start-up and commissioning of both systems. […]
Water Assessment/Audit report is including of three phases, first phase is existing documents and data review and evaluation and next phase was site work activities and reporting is final stage. The duration of this project is 22 days and the start date is: November 15, 2017.
The RTC wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. Green Tech was responsible for all design and installation, Start-up and commissioning of both systems. It had started on March 25, 2017.
Project is included two separated system, a grey-water and a black water system each by 10,000 GPD. GreenTech will be responsible for all design, installation, Start-up and commissioning of both system. project time line will be One year.
Providing all adequate and competent labor and supervision , all technical and professional and other services , all material , equipment, tools, supplies and transportation , and to perform all operations necessary and required for complete performance of the work for air emission test of diesel generators at Bershna Kot Substation, Kandahar, Afghanistan.
Green Tech has been awarded long term contract with FMIC to do water test, wastewater test and air quality monitoring in FMIC area.This is one year contract award base for 2016 and next one year option to 2017.
Green Tech awarded phase 3 of BEA, EIA and Environmental Lab services of railway development in Afghanistan as sub consultant with Canarail Co. Canada. Sampling of study area, site survey ,data collection and QUESTIONNAIRE FOR ANTICIPATED CHANGES AND EIA is part of Green Tech scope in this project.
The US Department of State through the Bureau of International Narcotics and Law Enforcement (INL) provides funding and project management for the construction and renovation of corrections facilities in support of the Afghan General Directorate of Prisons and Detention Centers (GDPDC). WWTF (Wastewater Treatment Facilities) is part of this support and Green tech JV JMCC […]