class="archive tax-bgmp-category term-design-of-water-and-wastewater-treatment-planet-wwtp term-5">

Blog Archives

Wardak

ANP Logistics Center in Maydan Shahr, Wardak

Samangan

Design, construction, installation, and supply of two (2) WWTPs, extended aeration system each 35,000 GDP, and Lift Station at ANA 209th Infantry Hazrat Sultan.

Paktia

Design and Consulting of New Wastewater Treatment System for Camp Thunder Geomembrane Services to Gardez Utility Project  

Mazar-e-Sharif

Design & Build of a WWTP package for ANCOP

Kunduz

Design of  WWTP – Afghan National Army (ANA) UP Provincial HQ in Kunduz

Kandahar

Installation of Geomembrane in Camp Hero Design of Water and Wastewater Treatment Planet (WWTP): Design of Water Supply System – CSB

Kabul

Water Testing Services for European Union Police Mission in Afghanistan Fabrication of Steel Secondary Treatment System for New Kabul Compound Darulaman Garrison Utility Upgrade Kabul Police Academy (KPA) Assistance of Environmental and Social Study for Feasibility Study on Urgent Water … Continue Reading

Jawzjan, Faryab, Sari-Pul

Environmental Studies of Amu Darya Oil Basin

Jalalabad

Design of WWTP – Afghan National Army (ANA)

Herat

WWTP- Lagoon System for Regional Police Training Center (RPTC) in Shindad