Project is included two separated system, a grey-water and a black water system each by 10,000 GPD. GreenTech will be responsible for all design, installation, Start-up and commissioning of both system. project time line will be One year.
Project is included two separated system, a grey-water and a black water system each by 10,000 GPD. GreenTech will be responsible for all design, installation, Start-up and commissioning of both system. project time line will be One year.