The work consists of the design, equipment procurement and installation for the Asia Consulting Group Wastewater Treatment Plant (WWTP). The plant is a small scale concrete package appropriate for residential buildings. Design part consists of design stages as 35%, 65%, 95% and 100% which includes process design report, detailed drawings and specification.
The work consists of the design of a new Wastewater Treatment Plant (WWTP) Aeriated Mixed Lagoon System at the Pol-i-Charkhi prison. This project is defined as the provision of material, labor, and equipment to construct WWTP lagoon system to accommodate 13,800 people. The design consists several stages as 35%, 65%, 95% and 100% and it […]