This project is about to conducting and provide site topographic survey, current and accurate survey of the impacted areas of the purposed electric Substation for dorm building, the site survey includes existing ground elevations, relative obstacle heights, drainage patterns, buildings, drives, sidewalks, fences, generator stations, above and below ground utilities and any other significant is […]
This project consists of the Site Adapt construction of ANP Bagram Ground Defense Area Checkpoints at various locations around Bagram Province. ANP Bagram Ground Defense Area Checkpoints consist of perimeter wall, vehicle gate, personnel gate, reinforced concrete entrance pad, guard tower, guard house, water storage tanks, wastewater holding tanks, aggregates surface course yard and aggregate […]
The purpose of the project is to incorporate the new equipment in to the existing facility, to refurbish the technical solution and bring the whole system up to the requested standards. Green Tech is responsible for design supervision and installation services for waste water treatment plant.
The purpose of the project is to enlarge and existing building placed in the Ministry of Defense (MOD) in Kabul, Afghanistan. The new building will be used for Day Care Facility of women and children and it is not only to extend an already present building, but also redesigning some part of the building like: […]
The objective of this project is Environmental Studies including development of ESIA report for Maihand Industrial Park, which located in Guzara District of Herat Province. This environmental assessment study includes study the existing environmental and social conditions, potential impacts and mitigation measures, environment and social management plan, monitoring plan, and HSE plan. The start date […]
The objective of this project is Environmental Studies including development of ESIA report for the Kajaki Dam Phase II project. This environmental assessment study includes study the existing environmental conditions in order to establish the present physical, biological and socio-economic scenario and also to predict future impacts owing to construction, operation and maintenance of the […]
The objective of this project was Environmental and Social Studies including Environmental and Social Management Plan, Monitoring Plan and Health and Safety Plan. This environmental assessment study includes study the existing environmental conditions in order to establish the present physical, biological and socio-economic scenario and also to predict future impacts owing to construction, operation and […]
The PD-9 wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. This project consists of design and construction of a wastewater treatment plant (WWTP) that includes WWTP package, lift station and drying bed. Green Tech is responsible for all design and installation, Start-up and commissioning of both systems. […]
Water Assessment/Audit report is including of three phases, first phase is existing documents and data review and evaluation and next phase was site work activities and reporting is final stage. The duration of this project is 22 days and the start date is: November 15, 2017.
The RTC wastewater treatment system included design flow of up to 9000 gallons per day of domestic wastewater. Green Tech was responsible for all design and installation, Start-up and commissioning of both systems. It had started on March 25, 2017.